Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat Occ card signed-Final ok
|
Electrical Rough-In | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | PASS |
Rock A. Hudson
|
|
|
Come out of elevator and turn left. 1st door on the right. Grid inspection only in that area. Phone #: ###-#### Inspection requested via web by Dean Gernaat Area noted grid rough in ok cover.
|
Electrical Rough-In | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Rock A. Hudson
|
|
|
Walls inspection only. 2nd Floor. Off elevator turn right through double doors. Go right in reception area. New walls are in the break room. There is a print on the reception desk. Phone #: ###-#### Inspection requested via web by Dean Gernaat Walls to north of reception have no electrical, south walls rough in ok cover
|