Final | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | NR |
James Ady
|
|
|
clay Phone #: ###-#### Contractor did not schedule final. Was unaware of inspection.
|
Electrical Rough-In | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
James Ady
|
|
|
Back door will be open. If you have any questions please feel free to contact Kaiden ###-####. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Morgan Corrections made Basement rough in only ok to cover
|
Electrical Rough-In | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | FAIL |
James Ady
|
|
|
The back door is unlocked. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan 10-2NM needed for water heater. Water bond shall be accessable
|