Final | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
James Ady
|
|
|
Julian Young is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce service upgrade only final ok
|
Final | 2/19/2020 | 2/20/2020 | 2/20/2020 | P | NR |
James Ady
|
|
|
Julian Young is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Need to re-schedule final after service is energized
|
Permanent Service | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
James Ady
|
|
|
Julian Young is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Contractor onsite. mast was in place, conductors not ran but were onsite. Ground rods driven. intersystem bond in place. Contractor will verify sub panels have seperated grounds. p/s o/h rec ok
|
Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
James Ady
|
|
|
Julian Young is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Discussed downsizing service from 400A to 200A. House is 5500 plus SqFt. with 2 kitchens and a pool. Need to see service Calc or leave at 400A. Solar has been installed. Discussed options to connect system to panel
|