Final | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Mark Moncarr
|
|
|
Jedd *screened* Phone #: ###-#### Ok final storage area in basement
|
Electrical Rough-In | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Mark Moncarr
|
|
|
Customer is finishing basement and we installed wiring for recessed lights and replaced old circuits for furnace and dryer. Home owner will be home this afternoon and understands he will likely have to use video to show an inspector what was done. Please contact Jedd Moore at ###-####. Call me if there are any issues. Thanks ~ Dan Phone #: ###-#### Inspection requested via web by Dan Hilke Ok cover from center to S side of basement. Area to right of stairs is for storage.
|
Electrical Rough-In | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | DONE |
Mark Moncarr
|
|
|
Talked to contractor about doing 1 final at end of remodel. Basement area is being remodeled in 2 to 3 stages. Talked to Daryl DeGrange about calling in for a few rough in inspections and 1 final at the end to save homeowner 2 to 3 seperate permit fees. This RI was preveiously inspected by Tom Saunders. Will inspect 2nd area when RI is finished.
|
Final | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | CANC |
Mark Moncarr
|
|
|
Jedd- homeowner will be home to show basement. Call for details. Thanks. Phone #: ###-#### Inspection requested via web by Dan Hilke Talked to contractor about doing a couple RI inspections and then a final at the end, This will save homeowner permit costs if contractor doesnt call in for seperate finals on 1 area, the basement.
|
Electrical Rough-In | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Tom Saunders
|
|
|
Rough-in for basement living room. 11 lights, three switches, and 7 receptacles. Call Wyatt with any questions. Thanks. Phone #: ###-#### Inspection requested via web by Dan Hilke... new furred out walls in basement and LED can lights in ceiling...ok to cover
|