Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Tom Saunders
|
|
|
Mierins ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...labelling, disconnect, and OCPD ok
|
Electrical Rough-In | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Tom Saunders
|
|
|
Jay Walters will be the onsite contact Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listings verified...discussed wiring with electrician...existing service meter not required to be modified...loadside type being done and labelling stating solar at full supply for service is required
|