Final | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Tom Saunders
|
|
|
Access is limited to this commercial building as they are open daily. We have emailed all photos of our job to the electrical rough-in inspector. Please contact Josh with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley....labelling, disconnect, and OCPD ok
|
Electrical Rough-In | 1/15/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Tom Saunders
|
|
|
Electrical Rough In for a Commercial Solar Installation Phone #: ###-#### Inspection requested via web by Bryan Lawley... UL listed equipment verified... images of rooftop electrical will be texted or emailed because of limited access to roof for final...open business at location seperate metering and disconnect will be at buildings meter pac...no consumer usage at building
|