Final | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
James Ady
|
|
|
If you need to check breakers there is a key in west disconnect inside disconnect. Phone #: ###-#### Inspection requested via web by shane miller corrections made final ok
|
Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | FAIL |
James Ady
|
|
|
Please inspect is there As early as possible please call ###-#### so he can arrive and open the door if needed Phone #: ###-#### Inspection requested via web by shane miller 440.22C Overcurrent shall not exceed manufacturer ratings. (25A max 30A installed Minnimum circuit ampacity is 23.8A. 25A breaker or fuses must be installed)
|
Final | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | CANC |
Eric Story
|
|
|
Phone # is for jeff- Please call to make sure he can let you in. Installed 2) new 30 amp circuits to future ductless splits to be installed . was hoping to get rough-in and final all at once. If You need to see units connected please advise and I can reschuedule after unit are in place. Thank you. Phone #: ###-#### Inspection requested via web by shane miller No final at this point untyil units set and wired
|
Electrical Rough-In | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Eric Story
|
|
|
Phone # is for jeff- Please call to make sure he can let you in. Installed 2) new 30 amp circuits to future ductless splits to be installed . was hoping to get rough-in and final all at once. If You need to see units connected please advise and I can reschuedule after unit are in place. Thank you. Phone #: ###-#### Inspection requested via web by shane miller Need to verify OCPD once units are installed (panel has twin 30-30 installed at time of inspection...)
|