Rough-In Permanent Service | 8/4/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
James Ady
|
|
|
Need service inspected permanent power for the building Phone #: ###-#### Inspection requested via web by robert feller 38K available fault current. 65K rated breaker. p/s u/g n ok
|
Rough-In Permanent Service | 7/29/2020 | 7/30/2020 | 7/30/2020 | P | FAIL |
Tiffany Carson-Herker
|
|
|
We will not be on site panels will be open for inspection Contact Robert if any questions Phone #: ###-#### Inspection requested via web by robert feller 110.24. AIC rating not available. (Asked contractor to remove all main bonding screws from sub panels. Screws likely to be installed by mistake)
|
Electrical Rough-In | 7/23/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
James Ady
|
|
|
Need trench inspected Phone #: ###-#### Inspection requested via web by robert feller Underground for remaining units and electrical room only ok to cover (no ufer preasent in footing)
|
Electrical Rough-In | 7/9/2020 | 7/10/2020 | 7/10/2020 | P | DONE |
James Ady
|
|
|
Need Trench inspected for back fill Phone #: ###-#### Inspection requested via web by robert feller Underground Feeder conduits on back side to Units along federal way. Units 1-4 not ready. Units 5-12 ok to cover
|
Electrical Rough-In | 5/7/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Tiffany Carson-Herker
|
|
|
nspection for 8 units for sheetrock cover. Will be on site until 3:30 Phone #: ###-#### Inspection requested via web by robert feller 8 units (1st building) OK to cover
|
Electrical Rough-In | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
James Ady
|
|
|
Will be on site need some underground inspected and pole bases. Phone #: ###-#### Inspection requested via web by robert feller underground to 2 street light along Federal way ok to cover
|