Rough-In Permanent Service | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Mark Moncarr
|
|
|
The HVAC base unit was relocated from the east side of the first floor to the west side of the second floor. I re-routed the existing circuit to the new location. Let me know if you have any questions. Thanks! Phone #: ###-#### Inspection requested via web by Dan Jennings Ok cover, AC wire moved. No service
|
Rough-In Permanent Service | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Rock A. Hudson
|
|
|
Please let me know if you have any questions. Thank you Phone #: ###-#### Inspection requested via web by Dan Jennings 352.46- PVC nipple needs bushings. Verify in future. 12-2 installed for solar requires inslpection prior to cover. Unit wiring only rough in ok cover p/s u/g n ok
|