Final | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Mark Moncarr
|
|
|
street light pedestal Phone #: ###-#### Inspection requested via web by Debby Pierce Ok final, AFC posted inside cabinet
|
Rough-In Permanent Service | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Mark Moncarr
|
|
|
street lighting service pedestal Phone #: ###-#### Inspection requested via web by Debby Pierce AFC needs posted upon final. p/s u/g n ok
|
Electrical Rough-In | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Mark Moncarr
|
|
|
street lighting underground to pole light locations Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover trench for street lights facing Curling Dr. For future street light inspections, Public Works needs to do the inspection as per Tom Marshall-Public Works. Trench is between 30"-36" deep.
|