Final | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
James Ady
|
|
|
Please call Phone #: ###-#### Inspection requested via web by Kyle Dillon corrections made final ok
|
Electrical Rough-In | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | FAIL |
James Ady
|
|
|
50 amp hot tub hook up please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon 680.26B. The metal parts listed in 680.26B1 through B7 shall be bonded together using a #8 solid copper bonding conductor. (Down spout needs bonded to motor not to disconnect)
|
Electrical Rough-In | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | CANC |
James Ady
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon
|