Final | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Eric Story
|
|
|
Please call Rocky and hour in advance if you''d like him to be there at inspection. Thanks. Phone #: ###-#### Inspection requested via web by Sarah Final ok
|
Final | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller No body home
|
Electrical Rough-In | 3/8/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Eric Story
|
|
|
Please call Rocky an hour in advance prior to inspection. Phone #: ###-#### Inspection requested via web by Sarah Schuller Verified U/L listing of solar array parts
|
Electrical Rough-In | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller No one on site and no material to verify listing
|