Final | 7/9/2020 | 7/10/2020 | 7/10/2020 | A | PASS |
Eric Story
|
|
|
Need final for ac units and bath GFI circuits in all 4 units. Call Jimmy @ ###-#### for questions Phone #: ###-#### Inspection requested via web by Robert Schroder Final ok
|
Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
Eric Story
|
|
|
Need an OK to cover both bathrooms in both upstairs units. Phone #: ###-#### Inspection requested via web by Robert Schroder Mini splits looked and are ok Both units upstairs ok to cover bathrooms
|
Electrical Rough-In | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Eric Story
|
|
|
need an ok to cover bathrooms in both bottom units. Phone #: ###-#### Inspection requested via web by Robert Schroder Ok to cover both bath units
|
Electrical Rough-In | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Eric Story
|
|
|
Need ok to cover holes we made to fish in the circuits to the 2 bottom units #3 and #4. Lock box is on #4 door. Call Jimmy for the code and questions. ###-####. Mini split units going in the living room of each unit. Phone #: ###-#### Inspection requested via web by Robert Schroder areas were fished are ok to cover-baths are needed to looked at at another date
|