Final | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Tom Saunders
|
|
|
There will be a key under the mat to confirm a disconnect inside the shed. Contact with any questions Phone #: ###-#### Inspection requested via web by Kory Peterson...job complete...ok to final
|
Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | CANC |
Tom Saunders
|
|
|
Approve for cover and final. Adding circuit to shed located left of garage. Contact with any questions 2084843037 Phone #: ###-#### Inspection requested via web by Kory Peterson... changed to rough....will schedule final for following Monday/Tuesday...verify disconnect
|
Electrical Rough-In | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Tom Saunders
|
|
|
Approve for cover and final. Adding circuit to shed located left of garage. Contact with any questions 2084843037 Phone #: ###-#### Inspection requested via web by Kory Peterson... pipe to shed ok to cover wiring 110V circuit to storage shed...disconnect required...verify at final
|