Permit Information
Permit NumberELE20-00556
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 924 W MCGREGOR CT
Project Name 
Customer Number3928
ePlanReviewNo
Description
New: Install medium voltage switchgear, three (3) transformers and associated feeders.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/17/20207/17/20207/17/2020APASS
DetailsJames Ady
Please call Rafael to go over items to achieve part final inspections status/TCO. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Inspections on this permit corrispond with ELE19-02250. Midium voltage install final ok
Electrical Rough-In7/15/20207/16/20207/16/2020APASS
DetailsJames Ady
Please call Bobby to inspect hallway grid ceiling and compressor area outlets and finishes. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Items left for TCO: In wall heaters and Grills, Entry exterior cans, Hot check mechanical rooms, Panel schedules, Hot check Water reclamation room, Mini-split Coated MC connectors, Emergency lighting test. Rooms 139-144 have been hot checked and ready for final. Rooftop has been checked and ready for final. Back hallway ceiling ok to cover. (Note: Compressor feeders and disc. will need installed before Final)
Electrical Rough-In7/13/20207/14/20207/14/2020APASS
DetailsJames Ady
Please call Bobby for inspection of underground for Boise street lighting and miscellaneous interior building inspections.

Thanks :) Phone #: ###-#### Inspection requested via web by Rafael Castillo No interior inspections. Concrete encased electrode for Myers cabinet ok to cover (Public works inspected underground, pole base and pole base location. Trench was covered prior to my arrival)
Electrical Rough-In7/13/20207/13/20207/13/2020PPASS
DetailsJames Ady
Please call Bobby to continue part final inspections. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Wearhouse, AKT room, CMM room and Drinking fountain hot checked and ready for final
Electrical Rough-In7/9/20207/10/20207/10/2020APART
DetailsJames Ady
Please call Rafael for inspection of CMM, prep room, and clean room ceilings. Continuation of hot checking in same rooms as time allows. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Re-inspect previously covered ceilings in N side offices & Clean room ceiling ok to cover. Prep rooms, Clean room, Wearhouse restroom hot checked and ready for final
Electrical Rough-In7/9/20207/9/20207/9/2020ACANC
DetailsJames Ady
Please call Joe for continuation of final inspections in office spaces. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo
Electrical Rough-In7/9/20207/9/20207/9/2020PPART
DetailsJames Ady
Please call Joe for continuation of final inspections in office spaces. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Hot check 1st and 2nd floor Offices, Open offices and Break room receps. Drinking fountain quad 1st floor west end dead CircuitL31-56. Ready for final. All 3 prep room ceilings ok to cover. Note: Tiles need removed in 3 offices North exterior wall 1st floor. Covered prior to inspection.
Electrical Rough-In6/29/20206/30/20206/30/2020PPASS
DetailsJames Ady
Please call Bobby for grid ceiling inspections of 1st and 2nd floor office spaces. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas listed ceiling only ok to cover
Electrical Rough-In5/27/20205/28/20205/28/2020APASS
DetailsJames Ady
Call Bobby for inspection of clean room walls. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Clean room walls only ok to cover
Permanent Service5/7/20205/7/20205/7/2020PPASS
DetailsJames Ady
Please call Rafael for inspection of UT-3 and MDP3 for permanent service, phase 1. Phone #: ###-#### Inspection requested via web by Rafael Castillo Contractor supplied Primary transformers checked, all main panels, grounding, Bonding and testing has been verified. p/s u/g n ok
Conference5/5/20205/5/20205/6/2020PDONE
DetailsJames Ady
Please call Rafael to discuss energizing gear for temp power. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Discussed provisions for Service inspection. Able to do service in phases. No temp service given.
Electrical Rough-In4/21/20204/22/20204/22/2020APASS
DetailsEric Story
Please call Bobby for miscellaneous R/I inspections at office and compressor rooms. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo
Compressor room/shop/storage rooms ok to cover
Electrical Rough-In3/23/20203/24/20203/24/2020APASS
DetailsJames Ady
Please call Bobby for office wall R/I inspection. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Vestibule, Clean room, Down womens restroom, Family restroom, Up Elevator shaft wall Not ready. All other areas rough in ok walls only ok to cover
Electrical Rough-In3/11/20203/12/20203/12/2020APART
DetailsJames Ady
Please call Bobby for wall R/I inspections of office and warehouse spaces.

Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo H line 3 -9 ok to cover
Electrical Rough-In3/9/20203/10/20203/10/2020PPASS
DetailsJames Ady
Please contact Bobby for inspection of pole bases for site lighting. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 12 pole bases only ok to cover