Rough-In Permanent Service | 6/17/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Rock A. Hudson
|
|
|
Thank You Phone #: ###-#### Inspection requested via web by Eric Brown Rough in ok cover p/s u/g n ok
|
Conference | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | DONE |
Mark Moncarr
|
|
|
Need to look at and on panel location. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Discussed panel location under stairs. No shelving to be done.
|
Electrical Rough-In | 2/18/2020 | 2/19/2020 | 2/18/2020 | A | PASS |
Mark Moncarr
|
|
|
Floor outlets in concrete. Call with questions. Thanks Eric Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover floor outlets
|