Final | 7/15/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Eric Story
|
|
|
Allan *screened* Phone #: ###-#### Final ok
|
Final | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | FAIL |
Eric Story
|
|
|
Alan - */Screened*/ Phone #: ###-#### MAx overcurrent shall not exceed manu. specs A/C max 15 and 20 installed Occupied residence
|
Electrical Rough-In | 3/16/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Eric Story
|
|
|
Alan Phone #: ###-#### ADU unit ok to cover
|
Permanent Service | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Eric Story
|
|
|
alan Phone #: ###-#### p/s u/g n ok(U/G not installed yet)
|