Final | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PASS |
Mark Moncarr
|
|
|
Final for garage Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final garage
|
Rough-In Permanent Service | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Eric Story
|
|
|
Wire addition to garage and set new service to sub feed old location - energize service for relocation. Phone #: ###-#### Inspection requested via web by Kendra Lanham Will need to verify sub-feed once service is disc.... Garage rough-in ok to ok cover p/s o/h rec ok New panel location is in a possible fire wall and EC will talk to GC about this location and may need to be moved or turned into a J-Box depending on BLD inspectors view....
|