Final | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Mark Moncarr
|
|
|
I spoke with homeowner and he said he will be home between 9 and 11am. Said yesterday got busy and he was unable to be there. He apologizes. Thank you very much! Phone #: ###-#### Inspection requested via web by Deslie Duskin Ok final. Corrections made.
|
Final | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | NH |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Deslie Duskin Homeowner not home daughter wanted her dad to be home for the inspection. Please coordinate another final.
|
Final | 6/10/2020 | 6/11/2020 | 6/12/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Homeowner is Sean Burdick. His cell phone is ###-#### Phone #: ###-#### Inspection requested via web by Deslie Duskin 210.8(A)- All 15 and 20 amp 120 volt receptacle outlets installed with in 6' of a sink shall have GFCI protection. Basement mech. area. 314.25- All boxes shall have covers. Kitchen old switch location,sump pump, jetted tub receptacles, transformer in basement ceiling. 422.30- A disconnecting means shall be provided for central air furnace in basement. Owner provided info on all work completed.
|
Electrical Rough-In | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Tricia Henderson Ok cover down bath area
|
Rough-In Permanent Service | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Mark Moncarr
|
|
|
Customer Sean wants a call before you get there if possible. Thank you!!! ###-#### Phone #: ###-#### Inspection requested via web by Tricia Henderson Contractor going back for other work. He will finish driving last grd rod a few more inches in. p/s o/h rec ok
|