Electrical Rough-In | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Tom Saunders
|
|
|
Above grid ceiling inspection for cover phase-2. Thank you Phone #: ###-#### Inspection requested via web by Brad Hoots...ok to cover
|
Electrical Rough-In | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Tom Saunders
|
|
|
Electrical underground at front entrance for bollard lighting. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots.. ok to cover
|
Electrical Rough-In | 7/21/2020 | 7/22/2020 | 7/22/2020 | A | PASS |
Eric Story
|
|
|
Above ceiling inspection east side. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Hard lids in baths and walk way ok to cover
|
Electrical Rough-In | 6/29/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Tom Saunders
|
|
|
Wall rough-in East side. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots...phase 2 walls ok to cover
|
Electrical Rough-In | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
James Ady
|
|
|
Under slab rough-in east side. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Event room underbground only ok to cover
|
Final | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PART |
Tom Saunders
|
|
|
This is only a partial final for the West half of the building so the tenant can relocate and we can start Phase-3 of the remodel. Please call if you have any questions, thank you Phone #: ###-#### Inspection requested via web by Brad Hoots... partial final Phase1 of building...offices, front entry and main north room
|
Electrical Rough-In | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | PASS |
Tom Saunders
|
|
|
Above ceiling inspection phase-1, thank you Phone #: ###-#### Inspection requested via web by Brad Hoots...ceiling grid ok to cover...excluding few panels for future inspection once hang lights and track lights requiring grid installed before can hang
|
Electrical Rough-In | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Tom Saunders
|
|
|
Stamped drawings are in the north breakroom. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots...prints onsite..corrections made...ok to cover
|
Electrical Rough-In | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | FAIL |
James Ady
|
|
|
West side wall rough-in. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Prints onsite are not stamped set. 330.12 MC shall not be exposed to physical damage. (New wall behind IT room, MC strapped in inside channel of steel stud)
|
Conference | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Tom Saunders
|
|
|
Need to discuss access above a new had lid ceiling. Please call Justin 30 minuets ahead to meet on site. Thank you Phone #: ###-#### Inspection requested via web by Brad Hoots...discussed access above hardlid...pull boxes and junction boxes will be accessible by panel being removed...requirement is accessible not required to be readilly accessible...will check access at final
|