Final | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot Ok final. Spoke with Jonathan on phone. A couple of recepts and lights were tested and function properly. Homeowners reside in home, can not go in due to Covid-19.
|
Electrical Rough-In | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Mark Moncarr
|
|
|
The contractor will be on site for access. Access to the area under constuction is a man door on the left side of the home. Phone #: ###-#### Inspection requested via web by Jonathan Poot Ok cover outside wall on S side of house to right of fireplace.
|