Electrical Rough-In | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
James Ady
|
|
|
Rough In Ceiling Inspection. Please contact Alfred Dixon 10 minutes prior to inspection so he can meet you there. ###-#### Thank you. Inspection requested via web by Cathy Duchek Ceiling ok to cover
|
Final | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
James Ady
|
|
|
Inspection. Please contact Alfred Dixon 10 minutes prior to inspection so he can meet you there. ###-#### Thank you. Inspection requested via web by Cathy Duchek final ok
|