Electrical Rough-In | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Mark Moncarr
|
|
|
Ok cover grd work from shop to house. Trench depth is around 22" in 2in pvc
|
Conference | 3/12/2020 | 3/13/2020 | 3/13/2020 | P | CANC |
Mark Moncarr
|
|
|
Set line in trench for sub panel connection. Need sign off to bury line in conduit. Inspection requested via web by Sean McCormick Should have been a rough inspection for grd work.
|
Conference | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | DONE |
Mark Moncarr
|
|
|
Conference for electrical plan Phone #: ###-#### Inspection requested via web by Sean McCormick Discussed new service being installed, 2 grd rods, and 1 grd rod at new panel on house. Discussed layout for outlets in new shop
|