Final | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | PASS |
Mark Moncarr
|
|
|
Patrick (electrician) said they needed inspection for controllers for pool light and cover and handrail bonding to be looked at from last inspection. Thank you Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok final. Metal railings are bonded underneath concrete walkway
|
Final | 4/17/2020 | 4/17/2020 | 4/17/2020 | A | NR |
Mark Moncarr
|
|
|
Please contact Patrick Rohm (electrician) with any questions. Phone #: ###-#### Inspection requested via web by A.M.E. Office Talked to Patrick, we will need to have all metal bonded before inspection. Handrails are being made and not sure when they are going to be installed.
|
Electrical Rough-In | 3/19/2020 | 3/20/2020 | 3/19/2020 | A | PASS |
Mark Moncarr
|
|
|
INSPECT UNDERGROUND CONDUITS FOR POOL. CONTACT IS PATRICK ROHM (ELECTRICIAN) Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover conduits for LV lighting.
|
Electrical Rough-In | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Mark Moncarr
|
|
|
Need an inspection for the equipotential bonding. Patrick Rohm is the electrician contac.t Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover. 4 corners bonded a long with motor. Large horizontal beams are welded to rebar which is all bonded. 4 LV lights, metal handrail will be bonded upon final.
|