Final | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PASS |
Tom Saunders
|
|
|
sign power...rigid in ground...surface wiring on building and sign structure...disconnects installed...ok to final
|
Electrical Rough-In | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Tom Saunders
|
|
|
Underground Inspection Phone #: ###-#### Inspection requested via web by Steven Ragan... pipe ok to cover...rigid conduit
|