Final | 7/15/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Eric Landberg Final ok
|
Electrical Rough-In | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Eric Landberg Existing circuits used, Misc. lights and exit sings moved in existing ceiling. Surface mounded conduits. Work performed in clean room area.
|