Final | 3/17/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please call Patrick at ###-#### 30 minutes prior to arrival so he can have building unlocked for you. Thanks Phone #: ###-#### Inspection requested via web by Winters LLC Final ok
|
Electrical Rough-In | 3/17/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please call Patrick at ###-#### 30 minutes prior to arrival so he can have building unlocked for you. Thanks Phone #: ###-#### Inspection requested via web by Winters LLC Break room grid rough in ok cover
|
Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Winters LLC Replug and switch, add exit, change to LED lamps through out, change complete luminaire in breakroom with sink. Listings confirmed. Rough in ok.
|