Final | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Hoots Final ok
|
Electrical Rough-In | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Eric Story
|
|
|
Above ceiling rough-in inspection. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Suspended ceilings ok to cover
|
Electrical Rough-In | 4/1/2020 | 4/1/2020 | 4/1/2020 | A | PASS |
Eric Story
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Brad Hoots Walls and hard lids in bath ok to cover
|
Electrical Rough-In | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Eric Story
|
|
|
Floor boxes for cover. Phone #: ###-#### Inspection requested via web by Brad Hoots Approved plans on-site Floor boxes ok to cover
|