Electrical Rough-In | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Mark Moncarr
|
|
|
Screened- Kevin Phone #: ###-#### Ok cover 1 room NW corner main level.
|
Electrical Rough-In | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Mark Moncarr
|
|
|
Kevin *screened* Phone #: ###-#### Ok cover wires in floor of existing deck location. This area is going to be framed in and used as livable space.
|
Conference | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | DONE |
Mark Moncarr
|
|
|
Kevin Phone #: ###-#### Discussed layout per code of recepts in new small addition.
|