Final | 3/14/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
James Ady
|
|
|
Inspect a new panel. 1 phase of the main breaker stopped working, changed out the panel.
* I will be there.
Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Final ok
|
Permanent Service | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
James Ady
|
|
|
Inspect a new panel. 1 phase of the main breaker stopped working, changed out the panel.
* I will be there.
Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Service change was done on a weekend. Re-energized. p/s u/g rec ok
|