Final | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Terissa Morain
Final ok
|
Electrical Rough-In | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Eric Story
|
|
|
Please call so we can meet onsite ###-#### Phone #: ###-#### Inspection requested via web by Terissa Morain Verified U/L listing of equipment and scope of work on Solar Array install
|
Electrical Rough-In | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | CANC |
Eric Story
|
|
|
per notes removed panels have boxes open ready please call to meet onsite ###-#### Phone #: ###-#### Inspection requested via web by Terissa Morain Called and left message/no call back
|