Final | 6/30/2020 | 7/1/2020 | 6/30/2020 | A | PASS |
Tom Saunders
|
|
|
Final for Rough-In per Tom''s request. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to final
|
Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Tom Saunders
|
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
Electrical Rough-In | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | FAIL |
Tom Saunders
|
|
|
Solar Pre-Wire for Future Solar System. Call Jed with any questions at 801.875.3714. Separate Building and Electrical Permit will be pulled. Phone #: ###-#### Inspection requested via web by Bryan Lawley... 1) wiring neat and workman like manner...110.12 2) NMB wiring...334.30 3) tear in sheating of NMB cable shall be replaced 4) grounded conductor being used as ungrounded conductor shall be marked
|