Final | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
James Ady
|
|
|
N/A Phone #: ###-#### Inspection requested via web by Aaron Decker Service only Final ok
|
Electrical Rough-In | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Decker Panel wall ok to cover
|
Permanent Service | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Decker Service already energized proir to inspection p/s oh rec ok 2 meters
|
Rough-In Permanent Service | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PASS |
James Ady
|
|
|
Either AM or PM Inspection requested via web by Aaron Decker Contractor disconnected ID power feed and reconnected prior to inspection. 250.24A1 Groundng electrode conductor shall be connected to the same terminal or bus to which the grounded service conductor is connected at the service disconecting means. (Move grounding electrode conductor from sub panel to main disc. on exterior of building)
|
Rough-In Permanent Service | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | CANC |
Eric Story
|
|
|
Rough-in of panel wall for Idaho Power turn on. Call 30 minutes pre-inspection for access instructions Phone #: ###-#### Inspection requested via web by Aaron Decker Need grounds and neutrals seperated on sub panels Remove bonding jumper and re-routte grounding electrode system to main panel where bonding is located
|
Conference | 3/16/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
James Ady
|
|
|
Thank You! Phone #: ###-#### Inspection requested via web by Aaron Decker Discussed seperation of 2 Dweling inits. 2 meter pack with 2 100A sub panels.
|