Final | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | PASS |
Mark Moncarr
|
|
|
garage code 9090 Phone #: ###-#### Inspection requested via web by Neal Rumsey Ok final.
|
Electrical Rough-In | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
James Ady
|
|
|
Floor heat in the master Phone #: ###-#### Inspection requested via web by Neal Rumsey Master floor heat only ok to cover
|
Electrical Rough-In | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Mark Moncarr
|
|
|
The holes have been approved Phone #: ###-#### Inspection requested via web by Neal Rumsey Ok cover bonus room.
|
Rough-In Permanent Service | 3/22/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey No RI. Do not cover. Bonus trusses were drilled. Talked to Dave Hannah he said if only 1 hole per truss and in center, should be ok. Wants to get ok from engineer prior to ok cover for electrical.
|