Final | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please call 30 mins ahead for access Phone #: ###-#### Inspection requested via web by John VanZandt Called ahead, Contractor called to inform of arrival, no answer at door, Ogata rep came over and met me on site, opened house, 2 high school age ladies in house. Final ok
|
Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
James Ady
|
|
|
Bathroom floor heat Insp Phone #: ###-#### Inspection requested via web by John VanZandt Bathroom 1 and 2 floor heat ok to cover
|
Electrical Rough-In | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please call ahead 30 mins for accesss Phone #: ###-#### Inspection requested via web by John VanZandt Upstairs jack and jill bathrooms changing to 2 full bathrooms. Rough in ok cover.
|
Electrical Rough-In | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | NH |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt no access
|