Final | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Rock A. Hudson
|
|
|
Final inspection please. Have a bless week! Phone #: ###-#### Inspection requested via web by Kyle Lott Final ok
|
Final | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | FAIL |
Rock A. Hudson
|
|
|
Final inspection please. Have a bless day. Enter through South entrance push button to get in. Phone #: ###-#### Inspection requested via web by Kyle Lott 210.70(A)(3)- A light shall be installed in attic for HVAC equipment located in attic. 210.63- A service receptacle shall be installed with in 25' and at same level as attic HVAC equipment.
|
Electrical Rough-In | 5/22/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
Rock A. Hudson
|
|
|
Rough - in please. Thank you. Blessings! Phone #: ###-#### Inspection requested via web by Kyle Lott Will need to verify light and receptacle in attic for HVAC equipment. East addition ceiling rough in ok cover.
|
Electrical Rough-In | 5/19/2020 | 5/20/2020 | 5/20/2020 | P | PASS |
Rock A. Hudson
|
|
|
Rough in inspection please. Thank you. Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott City approved print on site. Southwest addition only at this time, with access to attic HVAC equipment rough in ok cover.
|