Final | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
James Ady
|
|
|
The Myers Cabinet was relocated, and the light pole issues were remedied. Please call Paul with any issues ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean final ok
|
Permanent Service | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
James Ady
|
|
|
The Myers Cabinet was relocated, and the light pole issues were remedied. Please call Paul with any issues ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean p/s u/g n ok
|
Permanent Service | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
James Ady
|
|
|
The arc fault calculations have been added to the service, and the Myers Cabinet is now ready for final inspection. Please call Paul with any issues. ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean Schedule final after meter installed p/s u/g n ok
|
Permanent Service | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | FAIL |
Tom Saunders
|
|
|
Please inspect Myers Cabinet controlling Boise City lighting. Call Paul if there are any questions. ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean... AFC label required before power can be set...110.9
|