Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Tom Saunders
|
|
|
Pictures of trenching were sent I also had the ends opened and dug back down per your request let me know if anything else. thank you Phone #: ###-#### Inspection requested via web by Terissa Morain... labelling, disconnect, and OCPD ok
|
Electrical Rough-In | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | FAIL |
Tom Saunders
|
|
|
trench ready for insp Phone #: ###-#### Inspection requested via web by Terissa Morain... corrections not met as per correction notice requiring underground/trench be completely open for reinspection further reinspects shall have reinspection fees applied if requirements not met
|
Electrical Rough-In | 4/24/2020 | 4/27/2020 | 4/27/2020 | P | FAIL |
Tom Saunders
|
|
|
ready for electrical ground work inspection crew will be back onsite in the afternoon Phone #: ###-#### Inspection requested via web by Terissa Morain... 1) trench shall be a minimum 18" deep to top of pipe...2 open ends not deep enough...require mid point opened up to verify depth
|
Electrical Rough-In | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Tom Saunders
|
|
|
crew onsite Phone #: ###-#### Inspection requested via web by Terissa Morain... ground mount system UL listing of panels and equipment verified discussed location of disconnect at meter and required clearance at final inspection FUTURE ROUGH INSPECTION OF GROUND WORK REQUIRED BEFORE BARRYING PIPE..discussed with installer requirement need building permit inspection as well
|