Permit Information
Permit NumberELE20-01398
StatusFinaled
Name BIG DOG RENEWABLE ENERGY
Site Address 829 S COLFAX ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: solar array
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/7/20205/8/20205/8/2020APASS
DetailsTom Saunders
Pictures of trenching were sent I also had the ends opened and dug back down per your request let me know if anything else. thank you Phone #: ###-#### Inspection requested via web by Terissa Morain...
labelling, disconnect, and OCPD ok
Electrical Rough-In4/28/20204/28/20204/28/2020PFAIL
DetailsTom Saunders
trench ready for insp Phone #: ###-#### Inspection requested via web by Terissa Morain...
corrections not met as per correction notice
requiring underground/trench be completely open for reinspection
further reinspects shall have reinspection fees applied if requirements not met
Electrical Rough-In4/24/20204/27/20204/27/2020PFAIL
DetailsTom Saunders
ready for electrical ground work inspection crew will be back onsite in the afternoon Phone #: ###-#### Inspection requested via web by Terissa Morain...
1) trench shall be a minimum 18" deep to top of pipe...2 open ends not deep enough...require mid point opened up to verify depth
Electrical Rough-In4/22/20204/22/20204/22/2020PPASS
DetailsTom Saunders
crew onsite Phone #: ###-#### Inspection requested via web by Terissa Morain...
ground mount system
UL listing of panels and equipment verified
discussed location of disconnect at meter and required clearance at final inspection
FUTURE ROUGH INSPECTION OF GROUND WORK REQUIRED BEFORE BARRYING PIPE..discussed with installer requirement
need building permit inspection as well