Final | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Tom Saunders
|
|
|
ESW foreman, Dustin to meet Tom Sanders on site at 8:00. Tom is aware of the Final Inspection. Thank you Phone #: ###-#### Inspection requested via web by Paula Gratiot... images of rough were taken and shown...junctions made accessible to move power...ok to final
|
Electrical Rough-In | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Rock A. Hudson
|
|
|
Rough-In Request for Changes Done After Job Finaled. Original Job Permit for Commercial Remodel is ELE20-00585. Passed Final Inspection on 4-9-2020. New Permit Pulled per City of Boise Direction for Relocation of a Recessed Can That Was In The Wrong Place Which Also Caused a Switching Change We Also Need to Have This "Finaled" as Well. Thank You Phone #: ###-#### Inspection requested via web by Paula Gratiot New walls installed creating a break area and office, also a fireplace framed up in waiting area. Fire place framing has devices located behind framing. must relocate or remove. Called Dustin and informed of new fireplace and boxes of concern. Fireplace not approved. Walls for break area and office only rough in ok cover
|