Final | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Rock A. Hudson
|
|
|
Shed power not this contractors scope of work, installed rough in of underground conduit to shed only. Final ok
|
Final | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | FAIL |
Rock A. Hudson
|
|
|
screened - Mike Phone #: ###-#### 225.31- Disconnecting Means. Means shall be provided for disconnecting all ungrounded conductors that supply or pass through the building or structure. Shed is existing and interior wiring it is refed by new mobile home.
|
Electrical Rough-In | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PASS |
Rock A. Hudson
|
|
|
Mike Phone #: ###-#### Underground to house and shed rough in ok cover
|
Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Okamura Boise City Ordinance 4-05-23- It shall be unlawful to cover in any way electrical conduits prior to an electrical inspection. Underground from pedistal to mobile home and mobile home to shed covered prior to inspection.
|