Final | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Mark Moncarr
|
|
|
Rescheduled from 5/19 after talking with contractor Ok final. Received a few pics of gutter bond to tub, access panel was open to verify landing on ground bar. Tub GFI"s functioned properly on previous inspection, 2 pole 30 and single 20.
|
Final | 5/18/2020 | 5/19/2020 | 5/19/2020 | A | CANC |
Mark Moncarr
|
|
|
Rescheduled from 5/18 Rescheduled for 5/20 after talking with contractor.
|
Final | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | CANC |
Mark Moncarr
|
|
|
Final Inspection Date Requested W/ Customer. Please Contact Canyon Electric With Any Questions. Thank You Phone #: ###-#### Inspection requested via web by Louis Keller Rescheduled for 5/19, talked to Lewis
|