Final | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Mark Moncarr
|
|
|
Screened- inspection is in the garage -William Phone #: ###-#### Ok final. Panel labeled, recept added for welder circuit.
|
Permanent Service | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Mark Moncarr
|
|
|
I was waiting for a few pictures. Homeowner was very competent in what he was doing. Received pics of GEC to ufer that was sized for new 200a service. Will need to call in for a final to check panel labeling. p/s u/g rec ok
|
Conference | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | DONE |
Mark Moncarr
|
|
|
Willam Phone #: ###-#### Discussed requirements for 100a service to new 200a service. Homeowner not having power disconnected until around 1130 today by IDP. Edvised homeowner that this was a very late start.
|
Final | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | CANC |
Mark Moncarr
|
|
|
Screened- William Phone #: ###-#### Needed to be a permanent service, I added a perm serv.
|