Final | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
James Ady
|
|
|
Inspection requested via web by Terissa Morain Final ok
|
Electrical Rough-In | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
Eric Story
|
|
|
this is a very small 8 panel job will be starting in the morning and be done by after noon. Phone #: ###-#### Inspection requested via web by Terissa Morain Verified U/L listing of Solar Array equipment and scope of work.
|