Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Mark Moncarr
|
|
|
Headworks building underground inspection. Call Mike @ number listed for inspection location. Phone #: ###-#### Inspection requested via web by Tye Thomas Received pics. Ok cover 2 conduits in 12" exterior concrete wall West side of Headworks building.
|
Electrical Rough-In | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | PASS |
Mark Moncarr
|
|
|
underground inspection. please call mike with any questions Phone #: ###-#### Inspection requested via web by Tye Thomas Ok cover conduit 1 wall W side of Headworks building.
|
Electrical Rough-In | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Mark Moncarr
|
|
|
Headwork Building Site Underground Inspection. Call Mike @ number listed upon arrival to site Phone #: ###-#### Inspection requested via web by Tye Thomas Ok cover 6-4" conduits.
|
Electrical Rough-In | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Mark Moncarr
|
|
|
Call Mike at number listed with any questions. Phone #: ###-#### Inspection requested via web by Tye Thomas Ok cover grounding on E and W side
|
Electrical Rough-In | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Rock A. Hudson
|
|
|
Ufer inspection Please inspect at 8:00AM if possible. Call Mike at number listed for site location. Phone #: ###-#### Inspection requested via web by Tye Thomas Partial pour, 1/0 installed with future stubs to ground ring. Rough in oik cover
|