Final | 5/21/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Rock A. Hudson
|
|
|
Contact electrician Josh Slater. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Electrical Rough-In | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Rock A. Hudson
|
|
|
Contact electrician Josh Slater. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Called and confirmed verbally all penetrations fire caulked. 4 circuits for new sign located above main garage entrance to be completed by sign contractor. Rough in ok cover.
|