Final | 6/2/2020 | 6/3/2020 | 6/3/2020 | P | PASS |
Tom Saunders
|
|
|
I am having another service finaled in Meridian, hopefully in the morning. I should be able to be there with a 30 minute call ahead. Thank you! Phone #: ###-#### Inspection requested via web by Shawn Case...ok to final
|
Permanent Service | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | PASS |
Tom Saunders
|
|
|
Reinspect. Failed unfused conductors over 18". This job has taken longer than expected due to the extent of the ELE system that needed to be brought up to code. Family residence and we will be finished today to get them power back on and them home. If possible, please come towards the end of the day, we are working on having everything up to the line side of the meter main completed so Idaho Power can come ASAP. Please call, if possible, I dont want to be at Home Depot or somewhere and miss you. Thank you Phone #: ###-#### Inspection requested via web by Shawn Case... p/s o/h reconnect ok
|
Permanent Service | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | FAIL |
Eric Story
|
|
|
This was an emergency call, nuetral caught on fire in the meter base and Idaho Power has us shut completely down as of yesterday. We are just getting started this morning. Change out the mast, meter base, conduit to panel and all wiring between panel and weather head. Phone #: ###-#### Inspection requested via web by Shawn Case 230 Unfused conductors shall be installed throughout structure -Main disc at meter location and grounding upgrading
|