Final | 6/9/2020 | 6/10/2020 | 6/10/2020 | P | PASS |
Mark Moncarr
|
|
|
added a sub panel next to the main panel. added a two pole 60 amp breaker to feed furnace in attic. Furnace in attic has 60 amp disconnect built in furnace. added a circuit for split system at side of house in view of panel. Owner asked to be called 30 min before inspection at ###-####. name is Spencer. Thank you. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final. Contractor did load calc, figured 156a of loads on 200a all in one service.
|