Final | 8/1/2020 | 8/3/2020 | 8/3/2020 | A | PASS |
Eric Story
|
|
|
call for key code. Idaho Spine and Sport. Phone #: ###-#### Inspection requested via web by David McClellan Occ card not signed Final ok
|
Electrical Rough-In | 6/22/2020 | 6/23/2020 | 6/23/2020 | A | PASS |
Eric Story
|
|
|
call for key code Phone #: ###-#### Inspection requested via web by David McClellan or Jeff ###-#### Plans changed are on site and areas as specified have beed changed for ares-Rough-in ok to cover
|
Conference | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | DONE |
Daryl DeGrange
|
|
|
Screened - Requests 8AM - David Phone #: ###-#### Discussed wiring methods required by the NEC 517.13(A) Examination and treatment of patients shall be provided with an effective ground- fault current path.
|
Electrical Rough-In | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | FAIL |
Eric Story
|
|
|
call Chris for door code. ###-#### City stamped prints in box on entry door. Phone #: ###-#### Inspection requested via web by David McClellan As per 517.13 All treatment ares as stated shall have a redundent grounding system. Exam room ws changed but treatment stayed the same...
|
Electrical Rough-In | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | FAIL |
Rock A. Hudson
|
|
|
building vacant. call for key code. Phone #: ###-#### Inspection requested via web by David McClellan BCC- A city approved set of prints shall be on site prior to an inspection. 330.30- MC support and secure on east wall has been taken apart to add studs. Wiring hanging, boxes not secured, mudrings removed. General contractor trying to repair illegally. 517.13- Exam and treatment areas shall have an effective grounding path as per 250.118.
|