Electrical Rough-In | 8/12/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by gerardo vasquez.... prefab pole bases set, bond stinger verified, pipe depth coming in, and equipment grounding...all verified in miscellaneous locations
|
Electrical Rough-In | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | PASS |
Tom Saunders
|
|
|
underground. Gerry *screened* Phone #: ###-####....
undereground to new parking lot lights...inside parking lot and landscape areas...precast bases will be used...New LED heads will be installed...all listings will be sent by Email
|
Final | 8/13/2020 | 8/14/2020 | | A | |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by gerardo vasquez
|