Final | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Mark Moncarr
|
|
|
Call Kent ###-#### for access. If you have any questions please feel free to contact Fred ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. Existing conduit with in it was intercepted and installed in 2 ground boxes behind columns on front porch. They are not going to be used.
|
Electrical Rough-In | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Tom Saunders
|
|
|
Call Kent ###-#### for access. If you have any questions please feel free to contact Fred ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan..
new can lights front of garage in eve...fished in front porch new lighting...5 lights..ok to cover existing front post light wiring needs addressed...front door posts either side and front post light RT of driveway entry
|